Feasibility Study Process and Existing Conditions
- 345 Walnut Street Mitigation Plan DRAFT (205)
- 2021.06.10 NewCAL Working Group Feasibility Study Recommendation Letter (330)
- 2020.11.24 Newton Senior Center Geotechnical Report PSI Updated (288)
- 2020.10 Newton Senior Center Existing Conditions Assessment (403)
- 2020.09.30 Newton Senior Center Structural Code Review (359)
- 2020.09.28 Newton Senior Center Geotechnical Report PSI (390)
- 2020.09.25 Newton Senior Center Site Survey Control Point Assoc (204)
- 2020.09.23 Newton Senior Center Asbestos Inspection Report UEC (311)