Feasibility Study Process and Existing Conditions
- 345 Walnut Street Mitigation Plan DRAFT (263)
- 2021.06.10 NewCAL Working Group Feasibility Study Recommendation Letter (409)
- 2020.11.24 Newton Senior Center Geotechnical Report PSI Updated (359)
- 2020.10 Newton Senior Center Existing Conditions Assessment (522)
- 2020.09.30 Newton Senior Center Structural Code Review (440)
- 2020.09.28 Newton Senior Center Geotechnical Report PSI (445)
- 2020.09.25 Newton Senior Center Site Survey Control Point Assoc (249)
- 2020.09.23 Newton Senior Center Asbestos Inspection Report UEC (410)